Download IBM Maximo Asset Management v7.6 Functional Analyst.C2010-555.PassGuide.2019-02-04.56q.vcex

Vendor: IBM
Exam Code: C2010-555
Exam Name: IBM Maximo Asset Management v7.6 Functional Analyst
Date: Feb 04, 2019
File Size: 34 KB

How to open VCEX files?

Files with VCEX extension can be opened by ProfExam Simulator.

Purchase
Coupon: EXAM_HUB

Discount: 20%

Demo Questions

Question 1
A dispatcher needs to know the available staff for any given day. Laborers must track vacation time for the dispatcher to use. 
Where can this be done?
  1. Define Person Availability in the People application
  2. Modify Person Availability in the People application
  3. Define Person Availability in the Calendars application
  4. Modify Person Availability in the Calendars application
Correct answer: A
Explanation:
Reference: https://www.ibm.com/developerworks/community/wikis/home?lang=en#!/wiki/IBM%20Maximo%20Asset%20Management/page/Using%20WO%20Ticket%20calendars%20in%20SLAs%20to%20set%20target%20dates%20in%20tickets
Reference: https://www.ibm.com/developerworks/community/wikis/home?lang=en#!/wiki/IBM%20Maximo%20Asset%20Management/page/Using%20WO%20Ticket%20calendars%20in%20SLAs%20to%20set%20target%20dates%20in%20tickets
Question 2
A company has a requirement to report on actual labor hours, materials, services and tools used as work progresses on a work order. 
What is the earliest point in the basic life cycle a user can start reporting?
  1. APPR
  2. COMP
  3. WMATL
  4. WAPPR
Correct answer: A
Explanation:
Reference: http://www-01.ibm.com/support/docview.wss?uid=swg21683844
Reference: http://www-01.ibm.com/support/docview.wss?uid=swg21683844
Question 3
An approved work order has been assigned an incorrect job plan. 
How do you correct this?
  1. Change the Job Plan Revision to the correct revision.
  2. Clear the Job Plan field and enter the correct job plan.
  3. Create a Follow-up work order with the correct job plan.
  4. Select Remove Work Plan from the More Actions menu and enter the correct job plan.
Correct answer: D
Question 4
A company has a requirement to share calendar, classification, job plan, item description and PM data. 
What needs to be created?
  1. Single organization, single site environment
  2. Multiple organizations with a shared site environment
  3. Multiple organizations with one site per organization environment
  4. Multiple organizations with multiple sites per organization environment
Correct answer: A
Question 5
An engineer schedules a very complex asset report developed in BIRT. The engineer needs to set a feature to be able to retrieve the report contents from within Maximo for very large files that are restricted by the email server. 
Which feature does this?
  1. Direct Print
  2. Email with a File URL
  3. Email with a File Attachment
  4. REPORTSCHEDULE cron task
Correct answer: D
Question 6
A company has a requirement to have labor certificates defined. 
In which application can this be done?
  1. Crews
  2. People
  3. Certifications
  4. Qualifications
Correct answer: D
Question 7
An administrator has a requirement to ensure that purchase requisitions have been approved before being able to create purchase orders from them. 
Which settings control this behavior?
  1. Clear the Allow PO Creation From Unapproved PR? checkbox in Purchasing Options.
  2. Clear the Allow PO Creation From Unapproved PR? checkbox on the purchase requisition.
  3. Check the Require PR Approval on PO Creation? checkbox during the creation of the purchase requisition.
  4. Check the purchasing option Require Approval to Convert PR to PO or Contract? (checkbox in Purchasing.
Correct answer: D
Question 8
A company wishes to create a location that is used during the receiving process when inspection occurs. 
Which type of location is used?
  1. A HOLDING location at the SITE level.
  2. A CLEARING location at the ORG level.
  3. A RECEIVING location at the SITE level.
  4. An INSPECTION location at the ORG level.
Correct answer: A
Question 9
A user is in the Inventory application and has enabled a record for edit mode. The user performs an operation that does not release it from edit mode. 
Which operation is it?
  1. Save action
  2. Moving to Start Center
  3. Running a query from the list tab of the application
  4. Paging through records by using the Next and Previous links
Correct answer: D
Question 10
A user has created a work order against asset ABC. A technician determines that asset ABC is faulty and it needs to be replaced. The technician replaces asset ABC at the operating location with asset XYZ from a repair location. 
What happens after the swap?
  1. Asset locations have been swapped.
  2. Asset identifiers have been swapped.
  3. Inventory locations of the assets have been swapped.
  4. The faulty asset ABC status at the operating location gets updated to OBSOLETE.
Correct answer: A
HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset

HOW TO OPEN VCEX AND EXAM FILES

Use ProfExam Simulator to open VCEX and EXAM files
ProfExam Screen

ProfExam
ProfExam at a 20% markdown

You have the opportunity to purchase ProfExam at a 20% reduced price

Get Now!